Team on Site Post 1/3 Progress photos at The Foundry from the recent O’DB team site visit. The project, located in the Southside of Glasgow, consists of 206 new build units split across 11 residential blocks and is set to be completed late 2023. At current, each block can be seen at different stage in construction; with the scaffolding coming down on Block 03, brickwork going up on Block 04 and the concrete slabs being poured on the blocks front on to Maxwell Road ahead of the imminent delivery of the timber kit. #odonnellbrown #odonnellbrownarchitects #WoolgarHunter #design #housing #placemaking #designstudio #construction #glasgowarchitects #architect #glasgow #architecture #onsite