Take A Bow 2/3 The existing 1-2 storeys concrete structure was built 1972-4 and was in need of extensive repairs and upgrades to improve the thermal performance of the building. Last year, we gathered the thoughts and opinions of the community to understand how they use the building and what improvements were most needed. Drawing from their experience, we have been testing different options to improve the functionality of the internal layout and ease navigation around the building. The new extension accommodating a changing area is wrapped into the existing facilities with a new timber colonnade leading to an entrance canopy. The entrance colonnade improves the setting of the building and creates a greater sense of arrival and a better connection with the adjacent park by providing space for covered seating, opportunities for outdoor performance, and new signage and lighting. Internal works include a reconfiguration of the ground-floor toilets, bar and reception area as well as the introduction of a new lift to improve accessibility to the upper floor, and consideration of acoustics and joinery in the main hall to create a flexible multipurpose community room. @carbonfutures